Ontario Power Generation has a mandate from its sole shareholder, the Province of Ontario, to "expand, develop and/or improve its hydroelectric generation capacity" within the province. There are three proposed hydroelectric developments/re-developments on the Mattagami River within the Moose River Basin. The projects are the Lower Mattagami River Project, The Upper Mattagami River Re-development Project, and a new Hydroelectric Development at the Mattagami Lake Dam. The map below shows the location of the Lower Mattagami stations.

The terms upper and lower refer to flow of the river, the upper being the area "up-river" near Timmins, the lower being the area "down river" near James Bay.

Each of these projects will bring more clean, renewable, hydroelectric energy to Ontario helping to reduce our carbon footprint while improving our efficiency in use of existing waterpower resources.

Project information

The Lower Mattagami River project will allow a significant amount of new energy to be produced without creating new dams on other rivers. In addition to the electricity that will be provided, new development on the Lower Mattagami offers the potential for a commercial relationship with First Nations.

OPG received Provincial Environmental Assessment (EA) approvals to proceed with the Lower Mattagami Project and is in the process of securing Federal Approvals under the Canadian Environmental Assessment ACT (CEAA).

The Lower Mattagami Hydroelectric Complex is made up of four generating stations on the Mattagami River. The four stations are (from south to north): Little Long, Smoky Falls, Harmon, and Kipling. They are about 70 kilometers northeast of Kapuskasing and about 150 kilometers upstream of Moose Factory and the Town of Moosonee. Smoky Falls was built in 1931 and right now it has a size of about 50 megawatts. One megawatt produces enough electricity for almost 1,000 homes. This station is older and smaller than the others and does can not make effective use of the water passed through by the other three plants. OPG wants to replace it with a generating station that could use all of the available water efficiently. This would mean building a new generating station next to the old one. There would be new manmade structures such as an approach channel, intake and tailrace. The new generating station would be able to pass more water and would have a size of 250 megawatts. The original dams and spillways for the station would remain. Little Long, Harmon and Kipling were all built in the mid-1960s. Each station has two generators to make electricity. Little Long has a size of 135 megawatts. Harmon is 140 megawatts and Kipling is 155 megawatts.

Since the proposed new Smoky Falls dam would now be able to use more water efficiently, OPG is also intends to add a third generator to each of the three existing generating stations. Then the stations could use available water with the best possible efficiently and produce more electricity passing the same volume through each facility. Little Long would then have a size of 200 megawatts. Harmon and Kipling would each be about 240 megawatts. Together the whole project would add nearly 450 MW of capacity to the provincial system and make even better use of an existing resource.

Once construction work is started it is estimated that it would take about four years to complete all the work with a peak work force of about 600 people.

Lower Mattagami River Project

The Lower Mattagami River Project proposes redevelopment of the Smoky Falls G.S., and extension of Little Long G.S., Harmon G.S., and Kipling G.S. Work on the commercial feasibility of the project has been completed and OPG is in now in the process of discussion with Aboriginal peoples addressing Environmental Assessment requirements.

The Lower Mattagami Hydroelectric Complex is made up of four generating stations on the Mattagami River. The four stations are (from north to south): Little Long, Smoky Falls, Harmon, and Kipling. They are about 70 kilometres northeast of Kapuskasing and about 150 kilometres upstream of Moose Factory and Moosonee.

Smoky Falls was built in 1931 and right now it has a capacity of about 50 megawatts. (One megawatt produces roughly enough electricity for 1,000 homes. )This station is older and smaller than the others and does can not make effective use of the water passed through by the other three plants. OPG wants to replace it with a generating station that could make efficient use of the available water. This would mean building a new generating station next to the old one. There would be new manmade structures such as an approach channel, intake and tailrace. The new generating station would be able to pass more water and would have a size of almost 270 megawatts. The old dams and spillways for the station would remain.

Little Long, Harmon and Kipling were all built in the mid-1960s. Each station has two generators to make electricity. Little Long has a capacity of 135 megawatts. Harmon is 140 megawatts. Kipling is 155 megawatts.

Since the proposed new Smoky falls dam would now be able to use more water efficiently, OPG is also intending to extend the capacity of the other three plants by adding a third generator to each of the three existing generating stations. Then the stations could use available water with the best possible efficiently and produce more clean, renewable electricity. Little Long would then have a size of 200 megawatts. Harmon and Kipling would each be about 240 megawatts. Together the whole project would add nearly 450 MW of capacity to the system and make even better use of an existing resource.

Once construction work is started it is estimated that it would take at least four years to complete all the work with a peak work force of about 600 people.

The Lower Mattagami River project allows a significant amount of new energy to be produced without creating new dams on other rivers. This helps to reduce our load on the environment and keep our footprint small.

OPG received Provincial Environmental Assessment (EA) approvals to proceed with the Lower Mattagami Project and is in the process of securing Federal Approvals under the Canadian Environmental Assessment ACT (CEAA).

At this point the project is in the approvals phase. Our work includes discussions with Aboriginal peoples, detailed engineering and solicitation of proposals for project design and construction, addressing pre-construction Environmental Assessment and successful completion of a federal comprehensive study.

In order to accommodate some of this new generation, Hydro One is required to add a second 230 kilovolt (kV) circuit to the existing towers that run from Harmon Junction (Jct) to Kipling Generating Station (GS), approximately 4 km in length, as shown on the map below. Eleven of the thirteen existing transmission towers from Harmon Jct to Kipling GS would require modification and two anchor towers would need to be replaced. The project is expected to have minimal environmental impact since no vegetation removal or right-of-way widening is required and construction crews will be able to utilize existing access roads. Construction is expected to begin in early 2011 with an in-service date of June 2013.

Project documents

To request accessible versions of any documents, please contact us.

During the federal environmental assessment process information on schedule, public review notices and all decisions related to the project will be posted here.

A collage of photos showing people attending the open house.

Public open houses for the Lower Mattagami River Project were held in Kapuskasing and Smooth Rock Falls in January 2009. Members of the public had the opportunity to speak to OPG and its consultant team and with officials from the Department of Fisheries and Oceans and Canadian Environmental Assessment Agency. 

DISCLAIMER: Please note this website was only actively maintained during the related EA process period. As this process may have closed several years ago, the content of this site may not accurately reflect the current date and may include language with incorrect time references.